Our excavation division compliments our shoring operations by providing a seamless interface beginning at the ground level down to the bottom of excavation without the Contractor having to coordinate between separate Subcontractors. As the shoring system is being installed, it is critical that proper benches are graded to provide access for the various types of drill rigs which install tieback anchors that give the shoring system the required lateral support. Close coordination and sequencing between the excavation and shoring processes is critical to the proper and efficient installation of the different components of the shoring system while maintaining the overall project schedule.